Long over due, I made it out to a section of the Palmetto Trail. The Peak to Pomaria Passage to be exact. To be correct it's the Peak to Prosperity Passage. As of now only phase 1 is completed. So the plan was to run an out-n-back along the 6.5mi route. The trail is 90% shaded with exception to a noon days sun. With a 2% maximum grade, one way up and the other down. The run started at the Alston TH. The route is up to Pomaria (:59) then turn around for the return trip down to Peak (:57). Overall it was a peaceful run. Plenty of spiderwebs and the the rail ballast is the major challenge. This route would be a great option for a MTB route in the future. Combined with some local dirt/gravel sections. So if you are local and looking for something different check it out.
2 comments:
Now all we have to do is figure out how to cut a trail down to the International University trails. Liking the nuclear plant sign. Very reassuring.
Hi! I work with the Palmetto Conservation Foundation and came across your blog today. Good stuff! I keep a blog about my adventures around SC, some on the Palmetto Trail. Please consider checking it out, I'd love to hear what you think!
www.palmettotrail.tumblr.com
Post a Comment